Tehachapi East After Bay

Project Details:

  • Location:
    Tehachapi, CA
  • Client:
  • Owner:
    Dept of Water Resources
  • Additional Details:

    Duration: 4 months

4 Months in the winter with snow and 18degree Temps we had to maintain 40 degrees after concrete was poured.

49,000 Lf of joints sealed with Sika 1-A epoxy.

Click on an image to see a larger version